Noosa Mining Investor Conference Presentation
Released
Released
Announcement PDF
ASX Announcement
23 July 2026
Northern Minerals 1 of 2
NOOSA MINING INVESTOR CONFERENCE
PRESENTATION
Northern Minerals Limited (ASX: NTU) (the Company) is pleased to release the attached investor
presentation to be delivered at the Noosa Mining Investor Conference on 23 July 2026.
The presentation outlines the Company's progress in advancing the Browns Range Heavy Rare
Earth Project and highlights the growing strategic importance of dysprosium, terbium and
yttrium in supporting energy transition technologies, advanced manufacturing, and defence
supply chains.
Northern Minerals is developing one of the few significant heavy rare earth projects outside
China and remains focused on becoming a secure long-term supplier of these critical materials
to Allied Nation supply chains.
A copy of the presentation is attached to this announcement.
NEW INVESTOR HUB
The Company has also recently launched its new Investor Hub, providing shareholders and
stakeholders with a dedicated source of information on Northern Minerals, the Browns Range
Heavy Rare Earth Project, corporate updates, presentations and other key investor materials. The
Investor Hub can be accessed at https://invest.northernminerals.com.au/
This announcement has been authorised for release by the Board of Directors of Northern
Minerals Limited.
Northern Minerals 2 of 2
MORE INFORMATION
FOR FURTHER INFORMATION:
Shane Hartwig
Managing Director, Northern Minerals
+61 8 9481 2344
info@northernminerals.com.au
Northern Minerals
ABN: 61 119 966 353
Ground Floor,
40 Kings Park Road
West Perth WA 6005
T: +61 (0)8 9481 2344
www.northernminerals.com.au
FOR MEDIA ENQUIRIES:
Peter Klinger
Purple
+61 411 251 540
pklinger@purple.au
ABOUT NORTHERN MINERALS
Northern Minerals Limited (ASX: NTU) (Northern Minerals or the Company) owns 100% of the
Browns Range Heavy Rare Earths Project in the East Kimberley region of Western Australia (the
Project). The Project’s deposits are uniquely rich in the heavy rare earth elements dysprosium
(Dy) and terbium (Tb).
Dysprosium and terbium are critical in the production of high-performance neodymium iron-
boron (Nd/FeB) magnets used in clean energy, defence, and high technology solutions.
Dysprosium and terbium are prized because their unique properties improve the durability of
these magnets by increasing their resistance to demagnetisation.
Wolverine is the Company's flagship deposit within the Browns Range Project and is considered
one of Australia's highest-grade dysprosium and terbium deposits. The Company is preparing to
bring Wolverine into production with the objective of providing a reliable alternative source of
dysprosium and terbium currently supplied from China.
With the completion of the Browns Range Heavy Rare Earth Definitive Feasibility Study, the
Company is now progressing project funding discussions to enable the construction of a
commercial-scale operation focused on mining and beneficiating ore from the Wolverine
deposit, for delivery to Iluka Resources’ (ASX: ILU) under-construction rare earths refinery at
Eneabba, also in Western Australia.
In addition to Wolverine, Northern Minerals has several additional deposits and prospects within
the Project that contain dysprosium and other heavy rare earth elements, hosted in xenotime
mineralisation.
For more information, please visit northernminerals.com.au
ASX:NTU
Browns Range: Feeding the
heavies gap (Dy, Tb & Y):
Kimberley to Eneabba
22-24 July 2026
Noosa Mining Investor Conference
2
Important Notices & Disclaimer
This presentation (“Presentation”) is dated 23 July 2026 and has been prepared by Northern Minerals Limited (ACN 119 966 353) (“NTU”,
“Northern Minerals” or the “Company”). By attending a presentation or briefing, or accepting, accessing or reviewing this Presentation, you
acknowledge and agree to the terms set out below.
Summary information
This Presentation is for information purposes only and is a summary only. It should be read in conjunction with Northern Minerals’ most
recent financial report and Northern Minerals’ other periodic and continuous disclosure information lodged with the Australian Securities
Exchange (“ASX”), which is available at www.asx.com.au. The content of this Presentation is provided as at the date of this Presentation (unless
otherwise stated). Reliance should not be placed on information or opinions contained in this Presentation and, subject only to any legal
obligation to do so, Northern Minerals does not have any obligation to correct or update the content of this Presentation.
Certain market and industry data used in this Presentation may have been obtained from research, surveys or studies conducted by third
parties, including industry or general publications. Neither Northern Minerals nor its representatives or advisers have independently verified
any such market or industry data provided by third parties or industry or general publications.
Disclaimer – Northern Minerals’ Definitive Feasibility Study
The Definitive Feasibility Study (“DFS”) referred to in this report is based on technical and economic assessments to support the potential
viability of the project. The outcomes, production targets, and forecast financial information in this report are subject to a range of
assumptions regarding modifying factors, market conditions, and financing. There is no certainty that all assumptions will prove to be correct
or that the outcomes indicated by the DFS will be achieved. Investors are cautioned not to place undue reliance on forward-looking
statements. Further work, including additional studies and exploration, is required before a decision to mine can be made.
Past performance
Past performance, including past share price performance of Northern Minerals, and historical financial information, if provided in this
Presentation, is provided for illustrative purposes only and should not be relied upon as (and is not) an indication of Northern Minerals’ views
on its future financial performance or condition. Nothing contained in this Presentation, nor any information made available to you is, or shall
be relied upon as, a promise, representation, warranty or guarantee, whether as to the past, present or future.
Future performance and forward-looking statements
This Presentation contains certain “forward-looking statements”. The words “expect”, “anticipate”, “estimate”, “intend”, “believe”, “guidance”,
“should”, “could”, “may”, “will”, “predict”, “plan” and other similar expressions are intended to identify forward-looking statements. Any
indications of, and guidance on, future earnings and financial position and performance are also forward-looking statements. Forward-
looking statements, opinions and estimates provided in this Presentation are based on assumptions and contingencies that are subject to
change without notice and involve known and unknown risks and uncertainties and other factors that are beyond the control of Northern
Minerals, its directors and management . This includes statements about market and industry trends, which are based on interpretations of
current market conditions.
Forecast financial information (including NPV and IRR) is derived from the Production Target; all values are pre-tax and real (Q4 2024 dollars)
unless stated otherwise. Refer to the DFS announcement dated 15 September 2025
You are strongly cautioned not to place undue reliance on forward-looking statements, particularly in light of the current economic
climate and the significant volatility, uncertainty and disruption.
Forward-looking statements are provided as a general guide only and should not be relied upon as an indication or guarantee of future
performance. Actual results, performance or achievements may differ materially from those expressed or implied in such statements and any
projections and assumptions on which these statements are based. These statements may assume the success of Northern Minerals’ business
strategies, whether the success is realised in the period for which the forward-looking statement may have been prepared or otherwise. No
representation or warranty, express or implied, is made as to the accuracy, likelihood of achievement or reasonableness of any forecasts,
prospects, returns or statements in relation to future matters contained in this Presentation. The forward-looking statements are based on
information available to Northern Minerals as at the date of this Presentation. Except as required by law or regulation (including the ASX
Listing Rules), none of Northern Minerals, its representatives or advisers undertakes any obligation to provide any additional or updated
information whether as a result of a change in expectations or assumptions, new information, future events or results or otherwise.
Effect of Rounding
A number of figures, amounts, percentages, estimates, calculations of value and fractions in this Presentation are subject to the effects of
rounding. Accordingly, the actual calculation of these figures may differ from the figures set out in this Presentation.
No offer of securities
Nothing in this Presentation should be construed as either an offer or a solicitation of an offer to buy or sell any securities in Northern Minerals.
Reliance on third party information
The views expressed in this Presentation contain information that has been derived from publicly available sources that have not been
independently verified. No representation or warranty is made as to the accuracy, completeness or reliability of the information. This
Presentation should not be relied upon as a recommendation or forecast by Northern Minerals.
Reporting Requirements for Mineral Resources and Ore Reserves
As an Australian public company with securities listed on the ASX, Northern Minerals is subject to Australian disclosure requirements and
standards, including the requirements of the Corporations Act and the ASX Listing Rules. Investors should note that it is a requirement of the
ASX Listing Rules that the reporting of Mineral Resources and Ore Reserves in Australia is in accordance with the 2012 Edition of the
Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (“JORC Code”) and that Northern Minerals’
Mineral Resource and Ore Reserve estimates and reporting comply with the JORC Code.
Production Target
The DFS has confirmed an 11-Year Life of Mine (“LOM“) production plan target of up to 181,000 tonnes of TREO in concentrate and up to 4,350
tonnes per annum TREO (“Production Target“).
The Production Target and forecast financial information derived from the Production Target referred to in this release are underpinned by
Probable Ore Reserves (approximately 85%) and Inferred Mineral Resources (approximately 15%). There is a low level of geological confidence
associated with Inferred Mineral Resources and there is no certainty that further exploration work will result in the determination of Measured
or Indicated Mineral Resources or that the Production Target or forecast financial information reported will be realised. Accordingly, the
Company has scheduled the Production Target such that Inferred Mineral Resources do not feature as a significant proportion of the first 10
years of the 12-year mining plan. Approximately 6% of the Production Target material mined over the first 10 years is underpinned by Inferred
Mineral Resources. The Company is satisfied that the proportion of included Inferred Mineral Resources is not the determining factor of the
viability of the Project.
Competent Person Statement
The information in this document that relates to Mineral Resources is extracted from the Company’s ASX announcement titled “2025 -
Wolverine Mineral Resource Estimate” dated 16 January 2025, the Company's Annual Report released on 27 October 2025 and the Company's
ASX announcement titled "Dazzler Mineral Resource Estimate" dated 29 April 2026, which are available to view at www.asx.com.au under the
code "NTU". The information in this document that relates to Ore Reserves and the Production Target has been extracted from the Company’s
ASX announcement titled “Definitive Feasibility Study underscores global strategic value of Browns Range Heavy Rare Earths Project,
demonstrates its technical and financial viability” dated 15 September 2025, which are available to view at www.asx.com.au under the code
"NTU" (the original releases). Northern Minerals confirms that it is not aware of any new information or data that materially affects the
information included in the original releases and that all material assumptions and technical parameters underpinning the estimates in the
original releases continue to apply and have not materially changed. Northern Minerals confirms that the form and context in which the
Competent Person findings are presented have not been materially modified from the original releases.
References to “TREO” and “HREO” have the following meanings: TREO = Total Rare Earth Oxides –La2O3, CeO2, Pr6O11, Nd2O3, Sm2O3, Eu2O3,
Gd2O3, Tb4O7, Dy2O3, Ho2O3, Er2O3, Tm2O3, Yb2O3, Lu2O3, Y2O3. HREO = Heavy Rare Earth Oxides – Total of Sm2O3, Eu2O3, Gd2O3, Tb4O7,
Dy2O3, Ho2O3, Er2O3, Tm2O3, Yb2O3, Lu2O3, Y2O3.
3
Allied Nations are standing up new, secure, non-China permanent magnet supply
chains. Eneabba refinery construction is progressing at pace.
Allied Nations’ Magnet Supply
Dy, Tb and Y are
exhibiting significant
China/non-China price
bifurcation which
supports the NTU DFS
Divergence Case
released to market in
Sept 2025
Allied Nations are
prioritising secure
supplies of heavies (incl.
Dy, Tb and Y) for
defence, aerospace and
advanced
manufacturing
applications – forecast
mid-term supply deficit
for Dy, Tb and Y will
drive further investment
Supply agreement to
Eneabba (Iluka) for 100%
of planned production
for first 7+ years of
Browns Range provides
an established pathway
into an Australian
government-backed
(A$1.65bn funded) non-
China supply chain1
Geopolitical tensions
and export controls are
accelerating Allied
Nations’ commitment
and investment in
diversified, non-China
rare earth supply chains
(1) Some of the satisfaction dates applying to certain conditions precedent under the Supply Agreement have passed as at the date of this Presentation, which may entitle Iluka to terminate the Supply
Agreement. The parties are in discussions to facilitate their satisfaction or agree suitable extensions where appropriate to the applicable satisfaction dates. For further details see the risks disclosure under the
heading ‘Iluka Supply Agreement' in the Executive Summary included as an Appendix to the ASX Announcement released on 15 September 2025 titled “Definitive Feasibility Study underscores global strategic
value of Browns Range Heavy Rare Earths Project, demonstrates its technical and financial viability.”
4
Critical heavies (Dy, Tb and Y) feed for Australia’s first fully integrated rare earth
oxides refinery
Browns Range: Meeting the gap
Government Funding Support: Support from US EXIM and Export Finance Australia for potential
project funding (non-binding, conditional)1
1
Strategic Heavy Rare Earths: Dy, Tb and Y contribute ~78% of basket value. Potential upside from
Y price appreciation following PRC export controls not reflected in DFS economics.
2
Near-Term Development: FID target of 30 September 2026 with first production targeted Q4
2028 / Q1 2029 (subject to project funding)
3
Strong Economics3: A$592M estimated capex2 yielding potential A$705M NPV8, 21% IRR (pre-tax;
Divergence Case) and A$187 NPV8, 12% IRR (pre-tax; Base Case)
4
Development / Shovel Ready: Key primary approvals and tenure in place, DFS completed and
construction FEED underway. Funding negotiations continuing with 30 Sept FID target date.
5
(1) Please refer to ASX announcement dated 21 October 2025. (2) Real pre-production capex of Q4 2024 base date. Excludes working capital, financing costs, sustaining capital and corporate costs associated with
project development. (3) Refer to Browns Range Heavy Rare Earth Project Definitive Feasibility Study announcement dated 15 September 2025. NPV and IRR are pre-tax, real.
5
Browns Range Overview
An advanced heavy rare earth development
project located in Western Australia
Resources and Reserves
7.3 Mt @ 0.96% TREO Mineral Resource
5.2 Mt @ 0.88% TREO Ore Reserve1
Production
11-year proposed production plan2
Up to 181,000t of concentrate
Up to 4,350tpa TREO in concentrate
Product Mix
Dy, Tb and Y contribute ~78% of basket value
One of the highest-value rare earth product baskets globally
Strategic Partnership
Supplying HRE-rich feedstock to Iluka’s Eneabba Refinery
Development Status: Shovel ready subject to finance
Key primary approvals received
Project critical tenure granted
Native title agreements in place
FEED underway with FID target of 30 September 2026, subject to
project funding. Funding negotiations progressing
1) Including the Browns Range Pilot Plant stockpile.
2) Mine life and production plan are based on the Production Target, which is an estimate of future
production and is based on the modifying factors noted in the Ore Reserve Estimate. Production
Target includes the reported 2025 Ore Reserve Estimate along with supplemental mine production
based on Inferred Mineral Resources. Please refer to Important Information for further information.
6
Heavy rare earths dominate Browns Range's product basket and underpin its
strategic position
Browns Range: Strategic Basket
1) Based on average individual REO prices as outlined in the DFS.
High-Value Heavy Rare Earth Basket
Dy, Tb and Y contribute approximately 78% of
basket value
Product value is concentrated in strategically
important heavy rare earths
Browns Range is one of the highest-value rare
earth product baskets globally
Complementary to Iluka
Browns Range's heavy rare earth concentrate
complements Iluka’s planned light rare earth
production at Eneabba
Supports development of Eneabba as Australia’s
first integrated Australian rare earth oxides
supply chain
Browns Range Basket Value1
Dysprosium
48%
Terbium
22%
Yttrium
7%
Other
22%
7
(0)
2
4
6
8
10
12
2025
2026
2027
2028
2029
2030
2031
2032
2033
2034
2035
2036
2037
2038
2039
2040
kt REO
Supply Deficit Demand Supply
Dy and Tb are among the most strategically significant and supply-constrained rare
earths within the global supply chain
Why Heavies Matter
7
Dy/Tb supply-demand balance1
1) Source: CRU REE Special Report 2025
2) Percentage of 2024 Dy / Tb supply
56% supply
deficit2
70% supply
deficit2
Demand Growth
Dy and Tb are critical to high-performance permanent magnets used in
defence, EVs, wind turbines, humanoid robotics and advanced technologies
Demand growth continues to outpace forecast supply growth
Supply Constraints
China/Myanmar currently accounts for >90% of global HRE mine production1,
with limited ex-China projects coming online in the near term
Few advanced non-China heavy rare earth projects at scale are progressing
towards production in the near-term timeline planned for Browns Range
Strategic Importance
Allied nations are prioritising secure supplies of critical heavy rare earths;
facing significant shortages of Dy, Tb and Y from the mid-2030s.
Lack of supply raises significant defence and geopolitical considerations.
Market Signal
China/non-China price divergence is increasing the value of secure HRE
supply
8
Browns Range feeds Iluka’s government-financed Eneabba refinery – a funded, in-
construction pathway to separated heavy rare earth oxides
Integrated Aust. HRE Chain
Browns
Range
Eneabba
Refinery
Defence &
Advanced
Manufacturing
Non-China
Supply
Dy, Tb, Y in RE
concentrate
Browns Range provides HRE-rich xenotime concentrate for
an integrated Australian supply chain
Eneabba: a funded, in-construction customer (per Iluka
public disclosures)
~A$1.7–1.8B refinery; A$1.65B Australian Government non-
recourse loan (via EFA)
Construction more than 50% complete; commissioning
targeted mid-2027; designed to produce separated Nd, Pr,
Dy and Tb oxides and to accept third-party feed
Iluka announced 1st binding take-or-pay offtake (June 2026)
with a global automotive company — covering the full
magnet suite including Dy and Tb
Browns Range: contracted base with uncontracted
optionality
Supply agreement with Iluka: 30,500t contained TREO
contracted; up to 5.5ktpa maximum annual quantity; fixed
and market-linked pricing mechanisms (see previous ASX
announcements)
9
Completed (and announced) DFS demonstrates technical and economic viability with
a clear pathway towards development
Browns Range: Strong Economics
1) Real pre-production capex of Q4 2024 base date. Excludes working capital, financing costs, sustaining capital and corporate costs associated with project development.
2) C1 operating costs include mining, processing and general and administration costs and excludes corporate cost.
3) Refer to Browns Range Heavy Rare Earth Project Definitive Feasibility Study announcement dated 15th September 2025. NPV and IRR are pre-tax, real.
A$592M
Capex1
A$31.25
/kg TREO
Opex2 Potential pre-tax
Divergence Case3
Project returns
NPV8 A$705M
IRR 21%
Potential pre-tax
Base Case3 Project
returns
NPV8 A$187M
IRR 12%
10
Laser
rangefinders
Target
designators
Missile systems
PRC export controls have restructured the yttrium market and Browns Range is a
leading non-China deposit
Yttrium Upside
Market Repricing
Yttrium has been subject to PRC export controls since April 2025;
China dominates global yttrium mining and refining
Yttrium is individually designated on the United States’ 2025 List of
Critical Minerals; the US is ~100% net import reliant
Western and China yttrium prices have increased significantly since
the DFS with Western reported spot pricing trading at significant
multiples of the China price, reflecting China export controls
Browns Range Position
Yttrium is ~63% of Browns Range TREO by volume – the largest single
element in the deposit
The DFS basket value includes Yttrium at 2024 average prices (~7.4%
of basket value); no benefit from post-export-control repricing is
included in DFS economics
Yttrium is often irreplaceable in high-
performance applications
Turbine blade
and combustor
coatings
Jet engine
thermal
barriers
Specialty alloys
Ceramics and
semiconductor
manufacturing
LED phosphors
and fibreoptics
Medical lasers
11
Governments are deploying substantial capital to establish secure, non-China critical
minerals supply chains, including Eneabba in Australia
Allied Nations’ Resolve to
Establish New Supply Chains
United States Australia Strategic Frameworks
Secure RE supply for defence & industry
Reduce dependence on China
Support mining and processing projects
Gov-backed debt, equity and offtake
Develop domestic critical minerals projects
Establish downstream processing capability
Build Aus. critical minerals supply chains
Support regional infrastructure development
Coordinated gov. financing initiatives
Supply chain security and resilience
Support non-China rare earth supply chains
Key Players: US EXIM | US International Development
Finance Corporation | Department of War | Title III
Defense Production Act | National Security Fund
Finance
Key Players: EFA | NAIF | Critical Minerals Facility |
Future Made in Australia | National Reconstruction
Fund (NRF)
Key Initiatives: Australia-US Critical Minerals
Framework | Australia-US Climate, Critical Minerals
and Clean Energy Transformation Compact |
Minerals Security Partnership
As governments establish new non-China magnet supply chains, Browns Range is
positioned to help address a critical Dy, Tb and Y supply gap.
12
Recent allied nation transactions establish the financing architecture for non-China
rare earths and include contracted price floors
Government Capital: Deployed at Scale
Precedent Transactions
Arafura (ASX: ARU): EFA-anchored debt with sovereign-backed institutions across four countries; FID May 2026; construction from Sep 2026
Iluka (ASX: ILU): A$1.65B EFA non-recourse loan for the Eneabba refinery; construction more than 50% complete
Lynas (ASX: LYC): US Department of War rare earth oxide supply agreement including a US$110/kg NdPr floor price; A$180M Malaysian HRE
separation expansion.
MP Materials (NYSE: MP): US Government package including a US$110/kg NdPr price floor
USA Rare Earth: ~US$1.6B US Government funding package (2026)
Energy Fuels (NYSE: UUUU): US$725M conditional US Office of Strategic Capital loan commitment to expand U.S. rare earth processing and
metallisation capacity; supporting domestic mine-to-magnet supply chains
Serra Verde: US$565M US Development Finance Corporation financing package and 15-year offtake agreement with a US government-
backed SPV covering Nd, Pr, Dy and Tb; includes minimum price floors and upside sharing.
Pricing Architecture
Contracted price floors have entered western rare earth offtakes (MP Materials / US Government precedent)
Iluka’s first binding offtake (June 2026) is priced at the higher of an agreed floor or market price
Non-China price indices for magnet rare earths are emerging
These structures reflect the same China/non-China divergence underpinning the Browns Range DFS Divergence Case
Sources: Arafura ASX announcements dated 21–22 May 2026; Iluka ASX announcement dated 22 June 2026; MP Materials announcement dated 10 July 2025; Columbia Center on Global Energy Policy analysis dated 11
July 2025; Serra Verde announcements dated 5 February 2026 and 20 April 2026; Denham Capital transaction announcement dated 20 April 2026. Lynas ASX announcements dated 29 October 2025 and 16 March
2026; https://investors.usare.com/news-releases/news-release-details/usa-rare-earth-reports-first-quarter-2026-financial-results; https://investors.energyfuels.com/Y-m-d-Energy-Fuels-Receives-Conditional-U-S-
Government-Support-to-Accelerate-Growth-in-Rare-Earths-and-Critical-Materials
13
Browns Range aligns with Australian and US critical minerals priorities and has
received support from government-backed funding agencies
Gov. Support & Funding Pathway
Strategic Alignment
Supports Australian and US objectives to strengthen
critical minerals and rare earth supply security
Aligned with growing government focus on defence,
advanced manufacturing and strategic materials
Funding Support
US EXIM and EFA have issued non-binding, conditional
Letters of Interest and Support for potential project
debt financing under the EXIM-EFA Single Point of
Entry (refer ASX announcement, 21 October 2025)
US EXIM would be able to consider debt financing of
up to US$230M, in cooperation with EFA
Ongoing engagement with EFA and other
government agencies regarding project financing
14
Browns Range is progressing through financing, FID and construction towards first
production in Q4 2028 / Q1 2029 (subject to project funding)
Pathway to First Production
Q1 Q2 Q3 Q4
2025 2026 2027 2028
Financial
Close Target
FID
Target
FEED
Start
Mining
Commencement
First Con
on Truck
DFS Issued
Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
Construction
Commencement
Shovel ready (subject to funding): Key approvals in place, FEED underway and financing
activities advancing towards FID and Financial Close
15
Summary of Treasurer’s announced shareholding disposal orders to certain
shareholders
NTU Capital Structure & Register
Share Register – Australian Treasurer’s Disposal Orders
include:
On 19 May 2026, the Australian Treasurer made orders requiring the
disposal of shareholdings in NTU totalling approximately 17.6% of
issued capital (refer ASX announcement, 19 May 2026)
The orders followed NTU’s referral of beneficial ownership matters
to the Foreign Investment Division of Treasury (FIRB) in Nov 2025
The orders are directed at the relevant shareholders, not at NTU or
the Browns Range project
NTU considers the orders an important step in aligning its register
with Australia’s national security interests. NTU understands the
FIRB investigation is ongoing.
Further detail: NTU ASX announcements, including 19 May 2026
Capital structure 21 July 2026
Ordinary shares 9,549 million
Share price $0.028
Share price 52-week range $0.022 – $0.082
Market cap $267 million
Market cap 52-week range $176 – 749 million
Top-20 shareholders 56%
Cash at 30 June 2026 (unaudited) ~$34 million
16
Strategic Heavy Rare Earth Exposure
Dy, Tb & Y contribute approximately 78% of Browns Range basket value.
Help meet significant allied nation supply deficit for heavies
Positioned Within Non-China Supply Chains
Established processing pathway through Iluka's Eneabba Refinery.
Government Alignment and Support
US and Australian governments are prioritising secure critical minerals
and rare earths/magnets supply chains. Access to heavies is one critical
choke point.
Strong Potential Project Economics
A$705M NPV8, 21% IRR (pre-tax) under the Divergence Case.
A$187M NPV8, 12% IRR (pre-tax) under the Base Case.
Development Ready – Shovel Ready (subject to funding)
DFS completed, key approvals secured and FEED underway.
Upcoming Milestones
FID target 30 September 2026, subject to project funding.
Market conditions and project readiness are converging.
Why Browns Range now?
17
Appendix A: Ore Reserves and
Production Target
Ore Reserve Estimate1,3,4
1) Tonnages and grades are rounded to reflect the relative uncertainty of the estimate. Small differences in totals may
occur due to rounding. Ore tonnes rounded to nearest 10,000 tonnes. Dy2O3, Tb4O7 and Y2O3 grades rounded to
nearest 0.01 kg/t. TREO % rounded to the nearest 0.01 %. TREO t rounded to the nearest 100 t.
2) (TREO (metal) tonnes estimated from Mt x TREO%)
TREO = Total Rare Earth Oxides – La2O3, CeO2, Pr6O11, Nd2O3, Sm2O3, Eu2O3, Gd2O3, Tb4O7, Dy2O3, Ho2O3, Er2O3, Tm2O3,
Yb2O3, Lu2O3, Y2O3.
Browns Range Pilot Plant stockpile is an existing discrete parcel of mined ore, including a portion of Inferred Mineral
Resource material. The Inferred por
Share your feedback
Discover